September 15, 2026 · 5:30 p.m.

Outdoor pool stays closed while City considers what comes next

Commissioners did not direct staff to pursue a feasibility study. Staff said the pool will remain secured while the City works toward a public process for the future of the site.

Related issueFollow the stormwater issue trail →
Outdoor poolNo feasibility study directed
StormwaterResolution 5207 approved
River DriveResolution 5208 approved

60-second summary

The outdoor pool dominated the September 15 discussion. Commissioners heard public comment, reviewed the pool's long-running structural and operational problems and discussed whether the City should commission an engineering assessment. By the end of the discussion, there was no majority direction to move forward with a feasibility assessment. City Manager Grant Gager summarized staff's direction as securing the pool and developing a public process to understand what residents want for the site.

The Commission also approved Resolution 5207 concerning the City's stormwater program and Resolution 5208 authorizing changes to the Livingston urban area highway system. The latter would remove River Drive from View Vista to Ninth Street, plus Ninth Street north from River Drive to Geyser, from the state urban system so the City has more direct control over future improvements.

Bottom line: The pool remains closed, no engineering feasibility study was authorized at this meeting, and the future use of the site remains unresolved.

Three things to know

  • 1. The pool decision was essentially “not yet.” Commissioners did not order demolition, but they also did not direct staff to spend money on a feasibility assessment. Staff will secure the site and work toward a future public process.
  • 2. Stormwater moved forward. The Commission approved Resolution 5207 after the September 1 hearing had been continued because the City acknowledged a notice-timing problem.
  • 3. River Drive moved toward local control. Resolution 5208 was approved, advancing the removal of the identified River Drive and Ninth Street segments from the state urban highway system.

Votes and decisions

Resolution 5207 — stormwater: Approved by roll call.
Resolution 5208 — urban highway system changes: Approved by roll call.
Outdoor pool feasibility assessment: No motion approving a study. Staff summarized the direction as securing the pool and beginning a public process around the site's future.

Policy origin: stormwater utility

Outside input documented: The official policy trail reaches back at least to October 20, 2020, when the City Commission agenda listed a Storm Water Utility Creation Presentation and an agreement with AE2S. A later City-hosted feasibility study identifies AE2S as the preparer, describes collaboration with Headwaters Economics and the City, and lists TD&H Engineering among contributors. This documents outside technical participation in the policy-development process; it does not establish improper influence. Open the full Policy Origin timeline →

Official October 20, 2020 Commission record · Official City-hosted feasibility study

Why the pool debate matters

Staff described significant existing problems with the pool, including water loss, circulation issues and structural concerns. During the discussion, the City estimated that a comprehensive engineering assessment could cost roughly $30,000 to $50,000, depending on scope. Commissioners debated whether spending that money would be useful before the community has decided what it wants at the site.

Public comment and commission debate

Residents spoke both in favor of preserving outdoor swimming and in favor of weighing the condition of the facility against other City priorities. Commissioners repeatedly distinguished between the value of outdoor recreation and the question of whether this particular pool is practical to repair. FOIPub treats those comments as opinions and arguments, not as independently verified facts.

Transportation details

Resolution 5208 concerns River Drive from View Vista to Ninth Street and Ninth Street north from River Drive to Geyser. City staff said removing those road segments from the state urban system would give Livingston more direct control over projects such as pedestrian crossings and sidewalk improvements, while changing the funding and approval framework that applies to those roads.

Watch the meeting

Watch the full September 15 City Commission meeting on the City's official YouTube channel.

Verified votes

Full vote tracker →

Resolution 5207 — establish stormwater rates

roll call · Passed · 4-1
Melissa YesJames YesCindy YesJessica YesKemp No

Official recording

Resolution 5208 — changes to Livingston urban-area highway system

roll call · Passed · 5-0
Melissa YesJames YesCindy YesJessica YesKemp Yes

Official recording